Taro Logo
Profile picture

Accenture Interview Guide

Process Quality

With 56% of Software QA Engineers reporting a positive experience, 11% reporting a neutral experience, and 33% reporting a negative experience, Software QA Engineers overall have good feelings towards Accenture's interview process.

+22

Interview Toughness

Accenture's interview process is fairly selective, failing a large portion of Software QA Engineers who go through it. Only 33% of Software QA Engineers pass while the remaining 67% are rejected.

33%

Showing 3 of 9 interview experiences

Software QA Engineer

Software QA Engineer

Pune, India • January 1, 2022

Positive ExperienceNo Offer

Process

It is an online interview process. There are 2 technical rounds and one HR round. First, our resume got selected, and after that, they arrange the interview. They ask for our availability or time and date for the interview.

Questions

Accenture Technical

  1. Your experience
  2. Which tools you've used?
  3. What is the sequence of tags in Testng.xml?
  4. Explain your complete framework.
  5. What tool have you used for handling Excel sheets?
  6. What is a Regression suite?
  7. How many tests have you kept in the Regression suite?
  8. What is your team size?
  9. What is a constructor?
  10. Where have you used a constructor in the framework?
  11. What is inheritance?
  12. What is overloading?
  13. What is the difference between this and super?
  14. What is the difference between get and navigate?
  15. Difference between findElement and findElements?
  16. WebDriver syntax.
  17. What if I want to use the superclass methods in a subclass?
  18. Difference between global and local variables?
  19. What is encapsulation? And where have you used it?
  20. Implicit wait and Explicit wait differences.
  21. What is the reason to use TestNG?
  22. Have you performed parallel execution?
  23. What is a data provider?
  24. Where have you used a data provider?
  25. Code for string reverse.
  26. Pattern printing:

**


  1. How many test cases your team has automated?
  2. What have you modified in testNG.xml?
  3. If I have 4 test cases with priorities as -1, 0, 1, and no priority for the 4th case, tell me the sequence of execution.
  4. All the TestNG annotations.
  5. What part of your project test cases have you kept in @BeforeSuite?
  6. What have you kept inside @BeforeClass?
  7. What is the sequence of annotations?
  8. Can we overload the main method? Write a program to overload the main method.
  9. How to handle alerts?
  10. What is the method to check if a checkbox is selected?
  11. What is WebDriver and what is ChromeDriver?
  12. What if I changed the syntax of WebDriver from "WebDriver driver = new ChromeDriver" to "ChromeDriver driver = new ChromeDriver"?
  13. How are exceptions handled in Java?
  14. If my test case has an exception, and I put it in a try-catch block, will it run successfully or will it fail?
  15. How do you manage your testing? Like, do you perform automation on the same print or something else?
  16. How do you decide which test cases should go for automation?
  17. How do you give your own time estimates for particular user stories?
  18. What challenges have you faced in the estimation phase?
  19. Who assigns you the test cases?
  20. What are the three ways to select from a drop-down?
  21. Apart from POM, where is the usage of a constructor?