The folks in the graphics division are outstanding. Technically challenging work and a passionate group make for a strong work environment.
Lots of pieces of the business are no longer profitable. It's a difficult time right now as the focus shifts to mobile, embedded, servers, etc., from desktops.
Had a 1:1 interview with a project manager. Not many behavioral questions were asked. There were a lot of questions regarding SDLC, programming in C++, and Verilog.
A call with the hiring manager, then a call with the engineering manager. I was asked about my background and several position-specific technical questions. There was no LeetCode or whiteboard portion of the interview process. There were issues wi
Phone screening: Took about 1 hour and 20 minutes. The first 40 minutes were about my background (resume, educational background, and related topics). The next 40 minutes were used for answering a few technical questions.
Had a 1:1 interview with a project manager. Not many behavioral questions were asked. There were a lot of questions regarding SDLC, programming in C++, and Verilog.
A call with the hiring manager, then a call with the engineering manager. I was asked about my background and several position-specific technical questions. There was no LeetCode or whiteboard portion of the interview process. There were issues wi
Phone screening: Took about 1 hour and 20 minutes. The first 40 minutes were about my background (resume, educational background, and related topics). The next 40 minutes were used for answering a few technical questions.