Cross-functional collaboration for design, build, integration and test
Poor project management led to poor scoping of work.
- 30m call with recruiter - 30m call with hiring manager - 4hr teleconference - 45min presentation - Three 1x1 or 2x1 interviews - 30m final interview with director Overall there was a good balance between technical and interpersonal questions.
I got contacted by a recruiter, then moved on to recruiter screen. Next step was a hiring manager interview, then panel. The people were friendly and responsive all the way through.
3 stages, recruiter phone screen, hiring manager 1 on 1, then panel interview. Panel was 3 rounds, first 2 rounds each with 2 engineers of different backgrounds, then with the hiring manager again as the final round.
- 30m call with recruiter - 30m call with hiring manager - 4hr teleconference - 45min presentation - Three 1x1 or 2x1 interviews - 30m final interview with director Overall there was a good balance between technical and interpersonal questions.
I got contacted by a recruiter, then moved on to recruiter screen. Next step was a hiring manager interview, then panel. The people were friendly and responsive all the way through.
3 stages, recruiter phone screen, hiring manager 1 on 1, then panel interview. Panel was 3 rounds, first 2 rounds each with 2 engineers of different backgrounds, then with the hiring manager again as the final round.