People were decent to work with.
Leadership was awful, and there was lots of pressure.
The process involved talking with a number of representatives from HR, IT, and Product. Overall everyone was very pleasant and professional though the whole experience from start to finish. The interview process was much more streamlined that I have
OA contains 4 questions, needed to be done in 30 min, which is tight. There is a harder question needed to be finished in 10 min. There is a harder question needed to be finished in 10 min.
The interview process starts with a 15-minute introductory call with HR, followed by three rounds of technical coding interviews focused on LeetCode-style problems. There is no system design interview required as part of the process.
The process involved talking with a number of representatives from HR, IT, and Product. Overall everyone was very pleasant and professional though the whole experience from start to finish. The interview process was much more streamlined that I have
OA contains 4 questions, needed to be done in 30 min, which is tight. There is a harder question needed to be finished in 10 min. There is a harder question needed to be finished in 10 min.
The interview process starts with a 15-minute introductory call with HR, followed by three rounds of technical coding interviews focused on LeetCode-style problems. There is no system design interview required as part of the process.