Able to work from home in most engineering positions, and there was an effort in the past to help eliminate micro-management. It may not have been effective in all areas, but in my area I am no longer micro-managed, since it's a style that doesn't allow me to work to my potential.
Upper management is completely out of touch with what's going on inside the cleanroom.
There's a push to save money that's been going on for so long, all suggestions for cost savings would require us to take on jobs that we should not be doing, or put tools and products at risk.
The result of management's cost-saving measures could potentially cost much more than they save. But something has to make it onto paper, so they push stupid suggestions.
When people tell you that the reason they're quitting is because of fab conditions, start listening. All the good talent across the US isn't going to line up to work in a region that only has 3 months of good weather per year, so you need to keep the talent you have. Stop making their lives harder.
I received an email from the hiring manager to set up a phone call. I replied with my availability and the telephone interview was set up. He called me and asked about my academic and work experiences. Introduced himself and the nature of work at GF.
Online skills/behavior test followed by a phoned 1:1 with an HR rep. Then flown to NY for a technical interview with engineering staff members followed by a group exercise study with other candidates (graded by technical staff).
Phone interview, followed by on site interview. Standard interview rounds. Medium difficulty. Included a panel interview. I was asked to prepare presentation on projects from previous job. Most questions were directed at previous experience.
I received an email from the hiring manager to set up a phone call. I replied with my availability and the telephone interview was set up. He called me and asked about my academic and work experiences. Introduced himself and the nature of work at GF.
Online skills/behavior test followed by a phoned 1:1 with an HR rep. Then flown to NY for a technical interview with engineering staff members followed by a group exercise study with other candidates (graded by technical staff).
Phone interview, followed by on site interview. Standard interview rounds. Medium difficulty. Included a panel interview. I was asked to prepare presentation on projects from previous job. Most questions were directed at previous experience.