Engineers are more involved with product decisions.
In the past few months, work-life balance has taken a hit.
There are calls late at night with the US team. I feel like I never sign off; I work 12 hours a day and cannot distinguish between my work life and personal life.
I don't feel like sleeping after a late-night meeting, and I am more exhausted the next day. There are people who do not understand the meaning of async communication; they need a meeting for everything.
Somewhat fine, but I had a problem with last-minute rescheduling. The interview was rescheduled twice right before the original time, and I was not consulted about the new time. Then, halfway through the full loop, my interviews were canceled witho
It was an interview on the HackerRank tool with some LeetCode questions. The task wasn't too difficult to do. The interview was quite pleasant, but I was slightly out of practice with LeetCode-styled questions.
The interview didn't even happen. I was left waiting for over three months. It started with a referral. I was supposed to have an introductory call with a Director. He claimed to be sick and ignored me for three months. I was then rejected from the
Somewhat fine, but I had a problem with last-minute rescheduling. The interview was rescheduled twice right before the original time, and I was not consulted about the new time. Then, halfway through the full loop, my interviews were canceled witho
It was an interview on the HackerRank tool with some LeetCode questions. The task wasn't too difficult to do. The interview was quite pleasant, but I was slightly out of practice with LeetCode-styled questions.
The interview didn't even happen. I was left waiting for over three months. It started with a referral. I was supposed to have an introductory call with a Director. He claimed to be sick and ignored me for three months. I was then rejected from the