Chill workload Flexible deadlines Work-life balance
Slow processes Lazy employees across levels Bad tech stack Slow growth
I was asked about the projects on my resume. The company professional then asked me about my knowledge in OOPs, where I was questioned on runtime and compile-time polymorphism. I answered these with precision. Finally, I was asked a DP question, wh
The difficulty of the interviews was Easy to Medium. DSA is the most important thing. OOPs and DBMS concepts were asked in depth. Standard Oracle questions were asked, which can be found on GFG.
He asked me to introduce myself. Then, he gave me one Data Structures and Algorithms (LeetCode Hard) problem and asked me to solve it. I was able to do so, but in my solution, only 7 out of 11 test cases passed.
I was asked about the projects on my resume. The company professional then asked me about my knowledge in OOPs, where I was questioned on runtime and compile-time polymorphism. I answered these with precision. Finally, I was asked a DP question, wh
The difficulty of the interviews was Easy to Medium. DSA is the most important thing. OOPs and DBMS concepts were asked in depth. Standard Oracle questions were asked, which can be found on GFG.
He asked me to introduce myself. Then, he gave me one Data Structures and Algorithms (LeetCode Hard) problem and asked me to solve it. I was able to do so, but in my solution, only 7 out of 11 test cases passed.