Good location, well-health insurance, good bonus.
Management has problems. Career growth is not clear.
The online test comprises: * C++ * An aptitude test * A final interview
An initial introductory interview with the project manager. A second interview with HR, with standard HR questions. A third technical interview, where they asked in-depth questions about the work done. Overall, they were friendly and the technical
There are two tests. The first is on C++. The second is an aptitude test. In the aptitude test, there were three sections, and each question had limited time: a. Numerical Ability b. Verbal Ability c. Logical Reasoning. After that, there was a te
The online test comprises: * C++ * An aptitude test * A final interview
An initial introductory interview with the project manager. A second interview with HR, with standard HR questions. A third technical interview, where they asked in-depth questions about the work done. Overall, they were friendly and the technical
There are two tests. The first is on C++. The second is an aptitude test. In the aptitude test, there were three sections, and each question had limited time: a. Numerical Ability b. Verbal Ability c. Logical Reasoning. After that, there was a te