There were three telephonic rounds: one each for C++, databases, and algorithms. Since I joined as a contractor, there are no more interviews for me. One telephonic round was related to algorithms. The second was related to design and C++ fundament
Two phone screens were conducted at the start. This was followed by a panel interview. Then, I participated in one round of in-person interviews. I gave up after about 2.5 months into the process.
This was on campus in college. There was an aptitude test, with CS questions. It was pretty challenging; those preparing for GATE will find it easy. Then, there were 3 rounds of interviews, one programming test.
There were three telephonic rounds: one each for C++, databases, and algorithms. Since I joined as a contractor, there are no more interviews for me. One telephonic round was related to algorithms. The second was related to design and C++ fundament
Two phone screens were conducted at the start. This was followed by a panel interview. Then, I participated in one round of in-person interviews. I gave up after about 2.5 months into the process.
This was on campus in college. There was an aptitude test, with CS questions. It was pretty challenging; those preparing for GATE will find it easy. Then, there were 3 rounds of interviews, one programming test.