High chance of landing on a team with bad work-life balance, thanks to spineless leadership.
PIP culture is real, particularly in bad orgs.
Lots of bleeding-edge work on age-old tech.
S-team has completely lost the plot. Jassy is the absolute worst CEO.
Push back on timelines that make no sense. It leads to the death of organizational culture.
Started with an online assessment and then, upon clearing it, moved on to a four-round on-site interview loop. This included three rounds with the team and one round with the bar raiser.
5 rounds of interviews: 1. OA (2 Medium/Hard Questions along with some Work Related Assessment which tested design related concepts) 2. HLD 3. DSA 4. LLD 5. Bar Raiser Technically, the questions were of medium difficulty and with good polish, you s
Normal format with one OA and four rounds: two coding, one system design, and one low-level system design. Medium to hard level LeetCode questions. The low-level system design round had a common question requiring the use of the decorator pattern.
Started with an online assessment and then, upon clearing it, moved on to a four-round on-site interview loop. This included three rounds with the team and one round with the bar raiser.
5 rounds of interviews: 1. OA (2 Medium/Hard Questions along with some Work Related Assessment which tested design related concepts) 2. HLD 3. DSA 4. LLD 5. Bar Raiser Technically, the questions were of medium difficulty and with good polish, you s
Normal format with one OA and four rounds: two coding, one system design, and one low-level system design. Medium to hard level LeetCode questions. The low-level system design round had a common question requiring the use of the decorator pattern.