Good working environment and company culture.
Lack of career growth opportunity.
The interview was with the technical manager. The total time was around 80 minutes. Later, the HR round followed. So, basically, there was only one technical round as a whole. The manager mainly looked at whether you have the ability to learn.
Contacted by the recruiter, phone interview with her, phone interview with the hiring manager, face-to-face interview with the hiring manager and HR, followed by two other interviews. Got an offer a few days after that. Although everything happened i
Quite technical interview it was. Questions were asked from 2G, 3G optimization processes and parameters. I prepared for tough questions on the parametric side. Questions about RRC connected state, power control, paging, etc., were asked.
The interview was with the technical manager. The total time was around 80 minutes. Later, the HR round followed. So, basically, there was only one technical round as a whole. The manager mainly looked at whether you have the ability to learn.
Contacted by the recruiter, phone interview with her, phone interview with the hiring manager, face-to-face interview with the hiring manager and HR, followed by two other interviews. Got an offer a few days after that. Although everything happened i
Quite technical interview it was. Questions were asked from 2G, 3G optimization processes and parameters. I prepared for tough questions on the parametric side. Questions about RRC connected state, power control, paging, etc., were asked.