Projects are in good numbers.
The comp is not that great.
There were 3 interviews in total. The first interview was with the recruiter. The second was a technical interview with an engineer from the company. The third interview was with an architect and the same engineer. Questions covered Java, algorithm
I was contacted by a recruiter and scheduled for a phone screen call, followed by an initial technical interview. After clearing that, four loop interviews were arranged, which included a mix of technical system design and behavioral rounds. The day
There are two sets of interviews: The first set of three interviews are conducted on-site to separate the capable candidates from all others. The second set of interviews is specific to each of the hiring teams. If there are three teams searching f
There were 3 interviews in total. The first interview was with the recruiter. The second was a technical interview with an engineer from the company. The third interview was with an architect and the same engineer. Questions covered Java, algorithm
I was contacted by a recruiter and scheduled for a phone screen call, followed by an initial technical interview. After clearing that, four loop interviews were arranged, which included a mix of technical system design and behavioral rounds. The day
There are two sets of interviews: The first set of three interviews are conducted on-site to separate the capable candidates from all others. The second set of interviews is specific to each of the hiring teams. If there are three teams searching f