Lots of opportunities, fast-paced in the development areas.
Too big and bureaucratic. Lack of communication.
Do a better analysis on manpower and adjust appropriately.
Phone interview, mainly on my resume, past projects, and courses taken in college. There were several questions on FIFOs, clock distribution networks, and computer architecture. Make sure you are familiar with VLSI basics, transistors, and even pho
University 1-on-1 interview, including some whiteboard engineering problems that I was able to solve. A phone interview followed the 1-on-1. An IQ test was administered online after the phone interview. An on-site interview lasted for several hour
Met with a recruiter on campus. Had a phone screen. No technical questions were asked, but they inquired about my class projects. Had an onsite interview. I met with five engineers from different areas such as physical design, logic design, and tim
Phone interview, mainly on my resume, past projects, and courses taken in college. There were several questions on FIFOs, clock distribution networks, and computer architecture. Make sure you are familiar with VLSI basics, transistors, and even pho
University 1-on-1 interview, including some whiteboard engineering problems that I was able to solve. A phone interview followed the 1-on-1. An IQ test was administered online after the phone interview. An on-site interview lasted for several hour
Met with a recruiter on campus. Had a phone screen. No technical questions were asked, but they inquired about my class projects. Had an onsite interview. I met with five engineers from different areas such as physical design, logic design, and tim