Work environment, work-life balance.
Compensation is very low when compared to market standards.
It took months, seven months till the final interview. In total, five rounds, Java mainly, and the last one was a Java plus manager round. After the final round, HR called for salary negotiation, and everything was done. But no offer letter, nor did
OA 3 questions Medium 2 technical interviews 1 HR interview Technical interview 1: DSA and resume grilling Technical interview 2: System designing and DSA Must prepare for DSA, DBMS, OS, OOP thoroughly. A DBMS project is an added benefit. Developm
Almost 7 rounds of interviews. 1st round: Written SCJP, Aptitude. 2nd-7th rounds were taken by team members, covering all questions based on the Collections Framework along with threads. They also conducted resume screening.
It took months, seven months till the final interview. In total, five rounds, Java mainly, and the last one was a Java plus manager round. After the final round, HR called for salary negotiation, and everything was done. But no offer letter, nor did
OA 3 questions Medium 2 technical interviews 1 HR interview Technical interview 1: DSA and resume grilling Technical interview 2: System designing and DSA Must prepare for DSA, DBMS, OS, OOP thoroughly. A DBMS project is an added benefit. Developm
Almost 7 rounds of interviews. 1st round: Written SCJP, Aptitude. 2nd-7th rounds were taken by team members, covering all questions based on the Collections Framework along with threads. They also conducted resume screening.