Contacted by recruiter via LinkedIn. The process took two weeks. The phone interview was a marketing stunt by them, and then I was called in for a full-day interview (they call it the PowerDay). It was excruciatingly long, and I was tired as hell by the end of it.
Questions on previous experience.
Lunch was casual with informal, friendly conversations.
Controls Interview was difficult. I was asked about items that do not appear on my resume. I had to think hard back to my time in school.
Describe what happens when the inner feedback loop of a controller changes characteristics for the worse. They were expecting answers based on the root locus method or Bode plots.
The following metrics were computed from 1 interview experience for the Rivian Controls Engineer role in San Jose, California.
Rivian's interview process for their Controls Engineer roles in San Jose, California is extremely selective, failing the vast majority of engineers.
Candidates reported having very good feelings for Rivian's Controls Engineer interview process in San Jose, California.