best team and project, learning curve and scope to present my knowledge.
NA, NA, NA, NA, NA
There were around five in-person interviews. Each lasted 30 minutes. One round happened on Skype since the interviewer was not available. Some interviews asked algorithms, others checked general experience, and the last round was based on Hibernate
1. Programming Pre-assessment: Code-pen based coding problem. 2 problems. Moderate to high difficulty level. Dynamic programming and sliding window-based problems. 2. Technical Interviews: A. Coding round (dynamic programming and sorting based).
I received a LinkedIn message from an Apple recruiter. We scheduled a call, and then an interview was scheduled with the hiring manager. The interview was a Zoom call. It only lasted 30 minutes. From the start, before we even talked, the manager seem
There were around five in-person interviews. Each lasted 30 minutes. One round happened on Skype since the interviewer was not available. Some interviews asked algorithms, others checked general experience, and the last round was based on Hibernate
1. Programming Pre-assessment: Code-pen based coding problem. 2 problems. Moderate to high difficulty level. Dynamic programming and sliding window-based problems. 2. Technical Interviews: A. Coding round (dynamic programming and sorting based).
I received a LinkedIn message from an Apple recruiter. We scheduled a call, and then an interview was scheduled with the hiring manager. The interview was a Zoom call. It only lasted 30 minutes. From the start, before we even talked, the manager seem