The work progress is very slow, and most of the day is spent over emails and meetings.
Very little interaction with your manager and your team.
Email-based communication turns people very formal and cold to each other in personal interactions.
Degrading attitude to contractors: Peers that work beside you, doing the same job, but getting a very cold treatment (e.g., aren't invited to trips).
Let the developers focus more on the products and the code.
lengthy, analytical
1. Code up StrStr 2. OO questions, like the difference between encapsulation and inheritance 3. Reverse a linked list
This was through IJP from within MS itself, as an MS employee. Really bad interview process at MS. The GD (Group Discussion) was frustrating. I had to push HR to set up my interview as if I were the HR myself. Then, there were only two rounds throu
lengthy, analytical
1. Code up StrStr 2. OO questions, like the difference between encapsulation and inheritance 3. Reverse a linked list
This was through IJP from within MS itself, as an MS employee. Really bad interview process at MS. The GD (Group Discussion) was frustrating. I had to push HR to set up my interview as if I were the HR myself. Then, there were only two rounds throu